How it works

From pickup request to destruction certificate

Seven documented stages your company’s e-waste goes through at Triple RE, from collection anywhere in Egypt to certificates issued at our licensed plant in 6th of October City.

Triple RE collects e-waste from companies within 3 to 7 days of a request, anywhere in Egypt. It then goes through seven stages: collection and transport, registration, data destruction, dismantling, mechanical processing, precious metal recovery and final treatment. The destruction certificate and final report are issued within 14 days of pickup.

The seven treatment stages

  • Collection & transport

    We collect from offices, branches or plants in any governorate with a dedicated fleet for hazardous and non-hazardous waste.

  • Registration & documentation

    Devices are inventoried and logged on pickup for a documented chain of custody.

  • Data destruction

    NIST 800-88 secure wiping or physical destruction of storage media.

  • Manual dismantling

    Batteries, hazardous parts, circuit boards, metals and plastics are separated.

  • Mechanical processing

    Materials are shredded and sorted for recycling.

  • Precious metal recovery

    Valuable metals are recovered from circuit boards under our licensed activity.

  • Final treatment & report

    Non-recyclable fractions are disposed of safely and the destruction certificate and final report are issued.

What you get at each step

  • Before pickup

    An initial inventory, flagging devices with sensitive data, and a pickup date.

  • During treatment

    Every shipment logged, treated at a licensed plant under ISO quality, environment and safety standards.

  • After treatment

    Data destruction certificate, recycling certificate and a final report for compliance files and ESG reporting.

Frequently Asked Questions

How long does pickup take?

Usually 3 to 7 days from the request. Very large shipments (over 10 tonnes) can take up to two weeks.

Do you collect outside Cairo?

Yes. We serve every governorate in Egypt with a dedicated fleet for hazardous and non-hazardous waste.

When are certificates issued?

The destruction certificate and final report are issued within 14 days of pickup.

Where is the e-waste treated?

At Triple RE’s licensed plant: Plot 95, Industrial Zone (Youth Warehouses), 6th of October City, Giza.

Need our license for your vendor file, or a pickup for your company’s e-waste?

We reply within one business day. Call +20 100 069 1011 or email info@triplere.net.